Permatricity Info

    Author John Robertson      Full Employment !        (email robertsonj32@tiscali.co.uk )

Bangladesh -
Raising Fertile Land Covered by the Sea                     Site Map http://permatricity.com/Permatricity_Site_Map.html

Permatricity Art brings you - CHANGE  
Poets, Artists and Musicians are invited to add to my websites.


Global warming, ice melting, sea levels rising, Earth’s Centrifugal Force @ 1,000 MPH at the equator
 =
the low level fertile land at Bangladesh being covered by the river floods/sea
with millions of people losing land used for their homes and for growing rice and other food.

 I need people literate in English and Bangladeshi to email me and become co-ordinaters.

Centrifugal force will permanently flood Singapore.



The Fens, England, and above Port Augusta, Australia are just two of many places around the World that can produce Hydrogen and Lithium with  Wind Management Structures.

Description of Invention and Financing Solution

*May 9, 2008*

*Seawater Refinery and Energy Distributor*


Wind Management Structures, with Photovoltaic/CIGS, and/or Hydraulic Rams, pump seawater from sea level (1) to a higher level (2).

At Level 2 the seawater may be used for:

1)    Hydroelectricity
2)    Electrolysis for Hydrogen
3)    Reverse Osmosis/Electro dialysis for pure water 
4)    Extracting Lithium and other minerals from brine
5)    Pumping to Level 3
 
Level 3 and higher levels have the same functions as Level 2.

The need for much more hydrogen and lithium use is now a good reason to pipe seawater inland as it has, for electrolysis hydrogen production, a million times more electrical conductivity than pure water.

The objective of a Sea Water Refinery and Energy Distributor is to have as many Levels as the terrain permits and to lift as much seawater as possible to the highest level.

*The essential processes*

a)    Lifting the water with wind, photovoltaic/CIGS (PV) and tidal (Moonpower) from Sea Level 1 to Level 2. (Pump a large volume to higher levels).
b)    At Level 2, some hydrogen is produced with electrolysis, by using Wind Management Structures with PV added for the prime energy.
c)     Hydrogen engines pump the sea water to the highest possible level.
d)    The Hydrogen engines are cooled by the seawater.
e)    The warmed seawater produces more Hydrogen than cold seawater.
f)      The hydrogen engines exhaust some pure water for domestic and commercial use at Level 2.
g)    At Level 3 and above, the procedures at Level 2 are replicated.
h)     At the very highest Level the remaining seawater is sent on to Lake Eyre, or similar low areas. (or returned to Level 2) through a hydroelectric scheme and fed back into the seawater system to be re-used or refined to lithium, chlorine or some other value added product.

i)       Storage tanks at each level are connected with pipes for gravity to maintain the seawater levels.
j)       Where more pure water is needed, use Reverse Osmosis/Electro dialysis.
k)     More or less electricity and hydrogen are obtained with hydroelectric generation from the Highest Level to Level 2.
l)       This invention would be used with the big tides in Northern Australia, and the Mountains at Port Augusta, South Australia, to fill Lake Eyre.  Other versions would be used in the UK, Bangladesh and elsewhere.
m)   The emphasis is on hydrogen and lithium production and hydroponics, by distributing seawater, with the purpose of replacing land grown bio-fuels for transport and using the land for food and pure water production - while also dropping sea levels.
n)     Piped seawater, Wind Management Structures (Pat. App), hydroelectricity and low voltage, supersede high voltage power line grids and substations.

  Builders, Engineers and Carpenters, are offered FREE USE OF MY INVENTION and Free Permatricity Shares until a Patent is granted (approx in 2011)  This British Patent Application,  Number 0714883.6 for a Wind Management Structure, was filed on July 31, 2007,/ The International Application was filed exactly a year later.

Tuvali may be more easily saved with Gabions - instead of with big rocks.


email robertsonj32@tiscali.co.uk


May 9, 2008

Site Map http://permatricity.com/Permatricity_Site_Map.html







– A Land Reclaiming Gabion
To save and claim present land and restore water covered land, strong, large, plastic stackable gabion boxes are made with slits that have lips to catch floating mud and sand and so to fill the gabion box with mud and sand settling from the water (instead of using stones).  The slits allow roots and/or growth to come out to bind the gabion to its surroundings and not be washed away in floods.  Lids have holes to let floating mud in and rice, etc. to grow out.  Machinery may be used to more speedily fill the gabions while deepening canals.  Land may be recovered by stacking the Gabions, and securing them with poles driven into the  mud.

The gabions have the shape and function of house bricks and are say 2 metres X 1 metre X 1 metre

The land to be saved or to be restored is bordered and patterned with gabions, as if they were pavers.  Suitable plants and trees are planted in the gabions to ensure the gabions are anchored by the roots to the surroundings.  Trees bear fruit and provide fuel.  When additional layers of ‘pavers’ are added, holes and slits may be cut in the gabion boxes to accommodate existing plants and trees.  (Slits would be laced-up afterwards).

Bangladesh Land that has been abandoned to the sea – may be claimed like an old (pre-1971) South Australian opal mining claim that had Miners Rights.  The claim area would be about one acre.  A person may only have one claim at a time and it must be worked.. In that way a person may restore and retain sufficient land for a family - a home - to grow food – but not to graze animals, nor to monopolise land.   

Financing Solution - a Medium-size Version of The Money Solution


Permatricity Limited will initiate the scheme by selling the gabions on 5 years credit   If a buyer later abandons his land claim, he endorses his debt and ownership of gabions to the new claimant/buyer.   

*Small low sandy Islands.*

The same 5 year credit deal is offered.   By using big rocks and hydroponics, sunflowers and other plants may be grown in the Wind Management Structures.  .

*Necessary Government Support*

The Exporting Country (UK, Australia, etc ) provides standard Capital Goods Export Finance  Insurance.  The Importing Country (Bangladesh) provides standard credit-worthiness checks.

*Tributors (Sharefarmers)*

If a person wants to work land, but is not accepted for Export Finance Insurance, that person may be a Tributor for a person who is credit.worthy and able to buy capital goods on credit

*Amalgamation of Claims*

Up to 4 Claims may be joined together to form a partnership/syndicate.  Claims must always be pegged and marked as per an opal mining claim.  The Government will need to mark out the ‘Restoration Field’ (as per an Opal Field) and the claims are made within that field.  When building starts the field becomes a Permatri City

Claims with homes must have an electric, methane or hydrogen boat (also available on 5 years credit) and canal access to permanently dry land.  Canals must improve the flow of flood water, not impede the flow. Claims must have a sewage/waste to gas plant and also wind turbine and photovoltaic plant - all available on 5 years credit - to charge batteries and for cooking.

Claimants are mining hydrogen and lithium; they will build a water tower for a mini-hydroelectric plant and commercially produce and sell hydrogen, lithium, electricity, and pure water, along with the surplus food they grow.

Hydrogen, and gas from sewage will replace firewood as a cooking and heating fuel; more trees will be grown for flood protection, for timber, and to absorb CO2
  
This scheme can be commenced immediately to end the danger from rising sea levels and to improve the lifestyles of millions of people.  Other world deltas may be used in the same way to ‘grow land’ and ‘mine hydrogen’.

When all of the shallow water land is claimed, deeper land may be recovered and claimed, by stacking the Gabions, and securing them with poles driven into the  mud.

All approved capital goods will be sold on 5 years credit.


Starting Now

I copyrighted the financing documents used to build a good business.  We worked within the guidelines of Australia's Export Finance Insurance Corporation; other countries have the equivalent.

More than a century ago Australia wanted men to mine for gold but the bureaucracy was harsh.  The Victorian miners revolted and there was a brief 'civil war' called Eureka Stockade.  Arising out of that came the Miners Right and South Australia copied that law.  In the late 1960's I had a Miners Right.  In the early 1970's a new batch of bureaucrats abolished the Miners Right and replaced it with a Prospecting Permit.
The Miners Right Law enabled workers to stake a claim and keep it for as long as they worked it.  Coober Pedy, where I mined, is like a sea of arid dirt.  In Bangladesh the water is covering the fertile land, just as dirt covered the opal.  Some machinery is needed to bring the fertile land to the surface - that costs money.

We need one or more Bangladeshi worker who wants to peg a claim to mine for hydrogen and live on the claim.  That worker pegs his claim by following the old Australian Mining Law.  Then that (those) hydrogen miner(s) asks the Government to declare an area of shallow water to be a Hydrogen and Lithium Mining Field.  When the Government makes the declaration the workers ask Permatricity Limited to supply them with the mining capital equipment they need on 5 years credit. (gabions, boats, pipes, electrolysis, solar panels, wind turbines, etc)
Permatricity Limited will then approach UK and Australian Export Finance Insurers to gain approval to supply the hydrogen/lithium miner on 5 years credit.  The hydrogen miner may have to bring in partners or guarantors.  When the finance is organised the orders are placed with the manufacturers and the machinery is shipped.  Four hydrogen miners may amalgamate their claims into one company claim..

One person in Bangladesh needs to start - millions may follow.  Provided Laws are properly followed everyone knows what to do.  There is plenty of good land just under the water and there are plenty of people close by who can use hydrogen.  The mining plant need not take up very much land space so traditional crops can be grown.  New crops where roots permanently bind the mud should also be grown.

5 years should be plenty of time for the hydrogen/lithium miner to pay off his debt   If the miner is in trouble he/she should sell his claim or make arrangements to roll over his capital debt.


Ending Global Warming

The Sahara Desert can be farmed - the infertile land in Australia can be farmed.  The Permatricity Party will make laws to allow Permaculturists to farm earthworms to build up the fertility of poor soils and so create huge no-till Carbon Sinks.  The Permaculturist Laws will be based on the Miners' Rights Laws mentioned above where workers may peg out an Earthworm Farm and provided they keep the earthworms alive they retain their pegged out farm. 

It follows that if the earthworms are flourishing trees and plants will grow to store CO2 and provide an income to the Permaculturist.  The majority of UK land is fertile but some is not and that will be declared UK Desert and suitable for Earthworm Farms.  While the UK Deserts will be relatively small they will be valuable training areas for soil scientists preparing to export know how for the World's deserts and for Space Travel. .    .      . 





Web Hosting Companies